End collection deliberately.
Secure the final observations, complete the intended study’s phase transition, and retain the records and definitions needed for analysis.
On this page
1. Confirm that the whole study is ready to finish
Open the intended production study and check its name/version and In-progress phase. Agree with the team that recruitment and the planned collection are finished for everyone. Confirm who will make the phase change; that person needs permission to advance the study.
For the feelings example, finish each participant’s scheduled check-ins and any eligible So-so follow-ups, including the final answer windows. Account for any exit questions, interviews, participant communication and payment arrangements in your protocol.
A participant reaching their own participation end is different from completing the whole study. Downloading or analyzing incoming data does not require completion.
2. Secure the final participant data
- Complete the final-upload check at participant exit while each phone and its installed app are still available. Resolve outstanding exit checks before changing the whole study’s phase.
- On the website, open Data and select the participant’s coupon in the coupon list.
- Choose Data to view → Survey, Question tag → All and a Zoom level (days) covering the final participation period; select Confirm.
- Read the actual displayed interval and check the final expected answers, response states and available Uploaded evidence. Check the last feelings opportunity and any eligible feelings_detail follow-up separately.
- If the protocol collects sensor measurements, change Data to view → Sensor, select each required Sensor type and the relevant interval, then Confirm. Verify those final records too.
See the full filter bar
Participants → Last seen indicates pull/contact, not successful upload. Use received records and push evidence to resolve an upload gap. Keep the app and its data available until that check is resolved; deleting it can lose records that exist only on the phone.
3. Retain the collection record
Save a dated data export, its matching codebook/data package, the study metadata snapshot and the protocol-change log. Keep the study/version, final observation interval, receipt checks, outstanding exceptions and the team’s completion decision together.
To open a Download Data ZIP, use the study’s Researcher passcode on About.
Use the complete illustrated export task for download, ZIP access and the study tile’s Export JSON command. Record the retrieval time separately from the time of the last scientific observation.
4. Move In-Progress to Completed
This ends collection for the whole study and cannot be reversed. Check the study identity and final-data readiness before confirming. Use the control on the In-Progress panel.
- Open Study Phases in the study’s left menu.
- Find the active In-Progress panel. Select its Next Phase control.
- Check that the confirmation says Completed and that you are still working in the intended study.
- If the team is ready, select Yes, I’m sure. If the identity, destination or readiness is wrong, select Cancel and resolve it first.
5. Verify the recorded completion
- Reopen or reload Study Phases for the same study.
- Verify that its current phase is Completed and that the active Completed panel has a Completion date.
- Record that displayed date/time and its time convention in the study log. Keep it distinct from each participant’s end, last observation and final upload.
Completion does not replace the participant exit procedure or record that someone has been paid. Retain the exit and payment records required by your protocol alongside the collection log.
6. Keep the final extract interpretable
The study’s data remains available for download after completion. Retain a final dated extract with its matching codebook and definitions after the agreed receipt check. If a later retrieval includes additional earlier events, keep the earlier extract and document the changed cutoff rather than silently replacing it.
Read event times, response states, eligibility and protocol changes together. A Completed label verifies the phase transition; the final-data checks establish what reached the server.
Check your result. The intended study shows Completed with a recorded Completion date; final expected data and any unresolved exceptions have been checked and documented; dated exports and their matching definitions are retained. Continue with export or interpretation below.